loading

Shenmao Capacitors specialized in aluminum electrolytic capacitors from 1970.

Three methods of measuring the quality of electrolytic capacitors | Focus on medium and high-end brand capacitor manufacturers

When the electrolytic capacitor is out of the line: you can use a multimeter to detect the R×1k block. Before testing, we first touch the two pins of the electrolytic capacitor to discharge the residual charge in the electrolytic capacitor. When the test pen is just connected, the watch hand deflects to the right by an angle, then the watch hand slowly rotates to the left, and the watch hand stops at the end. The resistance indicated by the stop of the watch hand is the leakage resistance of the electrolytic capacitor. The larger the resistance, the better, and it should be close to infinity. If the leakage resistance is only tens of kiloohms, it means that the electrolytic capacitor has serious leakage. The greater the angle the watch hands swing to the right (the watch hands should also swing back to the left), the greater the capacitance of this electrolytic capacitor, and vice versa, the smaller the capacity. When the electrolytic capacitor is directly detected on the line: it is mainly to detect whether the electrolytic capacitor has been opened or broken down, these two obvious faults, and the leakage fault is generally uncertain due to the influence of the external circuit. Use the multimeter to R×1 block, after the circuit is disconnected, first discharge the residual charge in the electrolytic capacitor. If the needle deflects to the right during measurement, it indicates that the electrolytic capacitor is open. If the indicated resistance value is very small (close to a short circuit) after the hands are deflected to the right, it means that the electrolytic capacitor is seriously leaking or has been broken down. If there is no rotation after the hands are shifted to the right, but the indicated resistance value is not very small, it means that the electrolytic capacitor may be open-circuited, and the circuit should be disconnected for further testing. Detect when the electrolytic capacitor is energized on the line: If it is suspected that the electrolytic capacitor has a breakdown fault only when it is energized, you can energize the circuit, and then use a multimeter to measure the DC voltage across the electrolytic capacitor. If the voltage is very low or is 0V, the electrolytic capacitor has broken down. If the positive and negative signs of an electrolytic capacitor are unclear, the positive and negative electrodes must be distinguished first. Change the multimeter pen to test twice, taking the one with large leakage current (small resistance value) as the standard. One pin connected to the black test pen is the negative pole, and the other pin is the positive pole.

The manufacture marketing game of electrolytic capacitor is changing with each innovation, and businesses of all products need to be ready to pounce.

Shenzhen Shen MaoXin Electronics Co., Ltd. are dedicated to providing excellent underwriting and loss control advice up front, and to ensuring superior customer service through the life of the policy.

Shenzhen Shen MaoXin Electronics Co., Ltd. emphasizes our commitment to quality in our laboratory and R&D services.

electrolytic capacitor suppliers has become a serious problem for an increasing number of people around the world, that's why highly effective are developed by Shenzhen Shen MaoXin Electronics Co., Ltd..

GET IN TOUCH WITH Us
recommended articles
News
The core of power electronic technology is the conversion and control of electric energy.
In the field of semiconductors, what China needs to challenge is the industrial system accumulated in the West for hundreds of years.
Lead-free electronic components With the continuous improvement of environmental protection awareness, people are paying more and more attention to the environmental pollution of lead and the damage to human health.
The Indonesia International Consumer Electronics Show (ICEE·Indonesia 2018) was grandly opened at the Jakarta Convention Center in Indonesia.
In order to ensure the quality of components, my country has formulated a series of component standards.
More industry information can be found at www.transmission system has undergone tremendous changes in the era of new energy vehicles.
2017 National Day holiday notice Dear customers and friends: Hello! The National Day is coming soon.
Dear old and new customers: Thank you for your continuous support and love to our company, allowing us to move forward and develop steadily.
Integrated circuit failure analysis steps: 1.

Contact Person: Mr.Michael Seung
Mobile: 0086-18923870923
michael.seung@shenmaoec.com
www.shenmaoec.net 

Contact us for better product and solution

Dedicated to helping clients solve their most challenging?products?and technology issues.

Copyright © 1970 Shenzhen Shen MaoXin Electronics Co., Ltd. | Sitemap | Privacy Policy
Customer service
detect